The entire collection of Project Plans and Deliverable Documents;
everything in the 15 separate project packages described below.
Ideal for a Project Management Office or corporate document
repository. Over 500 Plan and Template files, representing more
than 6000 person hours of R&D work. Yours for just $399!
|
Best practices for Planning, Executing, and Closing projects.
Intended for users who need to build project management around
their in-house processes. Plan has 3 stages and 77 line item
activities and tasks. There are 26 deliverable templates. Note
that Project Management is included in most other packages.
|
Industry standard process to strategize, define, and implement
database-driven information systems. Plan has 7 stages with 169
line item activities and tasks. There are 37 deliverable templates.
Package includes Project Management material.
|
Complete process to support development on a variety of
Client/Server architectures. Plan has 7 stages with 213 line
item activities and tasks. There are 43 deliverable templates.
Package includes Project Management material.
|
Iterative prototyping process for the development of resource-
constrained projects. Plan has 4 stages with 89 line item
activities and tasks. There are 22 deliverable templates. This
package includes only mandatory Project Management items.
|
The classic time-tested methodology for Initiation, Analysis,
Design, Build, and Implementation. Plan has 7 stages with 149
line item activities and tasks. There are 30 deliverable
templates. Package includes Project Management material.
|
Process for the Design and Implementation of HTML-based
products. Plan has 6 stages with 109 line item activities and
tasks. There are 16 deliverable templates. Package includes
Project Management material incorporated into Discovery stage.
|
A platform-independent process to install, test, and rollout
Commercial-Off-The-Shelf (COTS) products. Plan has 6 stages
with 126 line item activities and tasks. Package includes Project
Management material.
|
Process to tender Commercial-Off-The-Shelf (COTS) products,
then evaluate, select, and acquire them. Plan has 6 stages with
126 line item activities and tasks. Package includes Project
Management material.
|
Process to assess enterprise needs, define a mandate, and
implement a Project Mangement Office. Plan has 7 stages with
150 line item activities and tasks. Package includes Project
Management material.
|
An Implementation, Rollout, and Piloting process designed for
enterprise technology migration solutions. Plan has 9 stages
with 170 line item activities and tasks. Package includes Project
Management material.
|
An end-to-end process to strategize, develop, and implement a
Kiosk Solution. Plan has 9 stages with 174 line item activities
and tasks. Package include Project Management material
modified specifically for Kiosk Deployment projects.
|
A proven approach to consistently produce winning proposals,
from RFP Evaluation to Bid submission. Plan has 4 stages with
78 line item activities and tasks. Package includes Checklists
and Worksheets. A must for engagement-based organizations.
|
A complete plan for SEC Sarbanes-Oxley Compliance, from Risk
Assessment, Control Process Evaluation and Remediation to
Auditor Attestation and SEC Filing. Plan has 5 stages and 116
line item activities and tasks. Based on COSO controls model.
|
A complete Customer Relationship Management implementation
process for small and medium business initiatives, from Value
Proposition to full Sustain. Plan has 6 stages and 152 line item
activities and tasks. Also good for reassessing failed CRM projects.
|
Based on ITIL© and ISO/IEC 20000© practices, this process
provides a complete plan, from Vision and Assessment through
Continuous Improvement, to implement IT Service Management.
Plan has 5 stages with 67 line item activities and tasks.
|
Drawing from TOGAF, FEA, and Zachman concepts, this process
provides an easy to understand framework and process to build your
Enterprise Architecture. Reference Models guide artifacts creation.
Plan has 8 stages with 155 line item activities and tasks.
|
Business Case
Change Management Plan Configuration Management Audit Configuration Management Log
Configuration Management Plan Communication Plan Funding Authorization Issue Management Plan
Meeting Agenda
|
Mission Statement Post-Evaluation Report
Project Charter Project Evaluation Report Project Organization Chart Project Progress Report
Project Proposal Project Selection Criteria Quality Management Plan
|
Requirements Traceability Matrix
Resource Management Plan Risk Analysis Risk Management Plan Scope Document
Service Level Agreement Stage End Report Training Plan
|
DW Definition
DW Delivery Plan DW Logical Design DW Operations Guide DW Physical Design
|
DW Quality Assurance Plan
DW Scope Document DW User Guide Extract, Transform, Load Plan End User Layer Definition
|
EWAS Review
Hi-Level DW Solution Sys. Devel. Envir. Spec. Test Plan plus PM deliverables
|
Business Process Options
Business Requirements Spec. C/S Design Specification C/S Operations Guide C/S Technical Architecture
C/S User Guide
|
Data Model
Deployment Strategy EWAS Model Functional Requirements Spec. Implementation Plan Process Model
|
Prototype Plan
Standards & Procedures Technical Requirements Spec. Training Materials
plus PM deliverables
|
Acceptance Test Plan
Change Request Design Specification Maintenance Guide RAD Business Requirements
|
System Document Index
Data Model Implementation Plan Operations Guide Process Model
|
Prototype Plan
plus PM deliverables
|
Data Conversion Plan
Installation Plan Operations Guide Problem Requirements List Requirements Specification
|
System Architecture
Trad. Waterfall Process Model User Guide Data Model Design Specification
|
Maintenance Guide
Standards & Procedures Test Plan
plus PM deliverables
|
Content Management Plan
Promotion Plan Security Plan Site Maintenance Plan
|
Test Scripts
Web Design Specification Website Requirements Definition Acceptance Test Plan
|
Implementation Options Plan
Package Technology Architecture System Administration Guide Business Process Options
|
System Development Environment Specification
Test Plan
plus PM deliverables
|
Contract Purchase Order
Pack. Selection Reqmnts. Spec. Request For Information (RFI) Request For Proposal (RFP)
|
RFP Response Evaluation
Technical Architecture Vendor Product List Business Process Options Implementation Options Plan
|
Sys. Devel. Envir. Spec.
System Admin. Guide Test Plan
plus PM deliverables
|
PMO Business Case
PMO Facilities Plan PMO Implementation Plan PMO Mandate PMO Pilot Project Plan
|
PMO Quality Management Plan
PMO Resource Management Plan PMO Standards & Procedures PMO Technical Architecture
|
Change Readiness Survey
Current Technical Architecture Pilot Project Plan Resistance Management Plan
Tech. Deplmnt. Business Reqmnts.
|
Tech Deplmnt. Operations Guide
Tech. Deplmnt. Technical Solution Technology Implementation Plan Technical Requirements Spec. Contract
|
Process Model
Standards & Procedures Manual Test Plan
plus PM deliverables
|
Kiosk Beta Test Plan Kiosk Business Case
Kiosk Business Requirements Kiosk Data Model Kiosk Design Specification Kiosk Functional Requirements
Kiosk Implementation Plan Kiosk Installation Checklist
|
Kiosk Option Validation
Kiosk Post-Evaluation Report Kiosk Process Model Kiosk Project Charter Kiosk Project Proposal
Kiosk Scope Document Kiosk Solution Architecture Kiosk Test Plan
|
Kiosk Training Plan
Kiosk User Requirements Request For Information (RFI) Request For Proposal (RFP)
RFP Response Evaluation Vendor Product List
plus PM deliverables
|
Action Item List Assignment Memo
Bid Brief Bid File Index Bid Management Plan Bid Risk Analysis Bid Risk Management Plan
Bid Strategy Compliance Matrix Cost Model
|
Customer Relations Plan
Customer Survey Detailed RFP Review Checklist Due Diligence Report
Final Quality Assurance Report Initial RFP Review Checklist Letter of Transmittal Meeting Schedule
Memo of Intent Price Model
|
Proposal Red Team Review Checklist
Requirements Summary RFP Confirmation Procedures RFP Receipt Memo RFP Review Schedule
Risk Register Solution Overview SWOT Report Team List Organization Chart
|
Assertion Declaration
Audit Committee Charter Audit Plan Audit Report Chairperson Assignment Memo
Committee Organization Chart Compliance Form Package Index Compliance Funding Authorization
Project Communication Plan Compliance Project Definition Compliance Project Org. Chart
|
Compliance Project Plan
Compliance Readiness Checklist Compl. Risk Assessment Plan Compl. Risk Assessment Report
Compliance Risk Register Compliance Scope Document Compliance Standards Manual
Compliance Test Plan Control Environment Survey Current Process Inventory Disclosure Committee Charter
|
Disclosure Plan
Distribution Sign-Off Sheet Gap Analysis Internal Audit Cmtee. Charter
Internal Control Framework Letter of Ext. Auditor Confirm Project Manager Assignment
Remediation Design Spec. Risk Control Matrix SOX Act Brief
|
Business Metrics Survey
Change Management Plan Config. Management Audit Rep. Configuration Management Plan
CRM Communication Plan CRM Business Case CRM Contract CRM Functional Requirements
Data Migration Plan CRM Deployment Plan CRM Funding Authorization CRM Gap Analysis
CRM Issue Management Plan CRM Maintenance Guide Memo of Intent
|
Vision & Mission Statement
Needs/Objectives Definition CRM Organization Chart Purchase Order Sample
CRM Post-Evaluation Report CRM Project Evaluation Report Quality Management Plan
Readiness Assessment Survey Resource Management Plan Request For Information (RFI)
Request For Proposal (RFP) RFP Response Evaluation CRM Risk Analysis CRM Risk Management Plan CRM Scope Document
|
Service Level Agreement
Standards & Procedures Manual CRM Strategy Document CRM System Integration Plan
CRM Test Plan CRM Training Plan Training Materials Index CRM User Guide
CRM Vendor/Product List Current State Meeting Agenda CRM Executive Survey
Stakeholder Meeting Agenda CRM Stakeholder Survey CRM Value Proposition
|
Availability Management Impl.
Awareness Presentation ITSM Business Case Capacity Management Impl.
Change Management Impl. Configuration Management Impl. Corp. Mission & Vision Stmnt. Continuous Service Improvement
Financial Management Impl. ITSM Funding Authorization
|
ITSM Gap Analysis
ITSM Implementation Plan Incident Management. Impl. ITSM Organization Chart
Problem Management Impl. Process Maturity Framework Process Self-Assessment ITSM Project Charter
Project Evaluation Report Release Management Impl.
|
ITSM Scope
Service Continuity Management Service Desk Impl. Service Level Management
Service Level Agreement ITSM Stakeholder Survey ITSM Test Plan & Scripts ITSM Training Plan
ITSM Vision Statement
|
Application Gap Analysis
Application Ref Model Architecture Principles Business Gap Analysis.
Business Operating Model Business Ref Model Business Strategy Evaluation Plan
Framework Definition Funding Authorization
|
Governance Plan
Info. Gap Analysis Info/Data Ref Model Maintenance Plan
Doc. Meth. & Standards Migration Plan Project Charter Project Org Chart
Project Proposal Repository Spec.
|
EA Scope
Security Gap Analysis Security Ref Model Technology Gap Analysis
Technology Ref Model EA Tool Selection Vendor Tool Comparison
Vision & Mission Statement
|
24 MB download file!
Hi-Speed connection recommended
Package has all these,
or buy singles for only $2.50
|
Package has all 38 templates,
or buy singles for only $2.50
|
Package has all 38 templates,
or buy singles for only $2.50
|
Package has all 23 templates,
or buy singles for only $2.50
|
Package has all 36 templates,
or buy singles for only $2.50
|
Package has all 13 templates,
or buy singles for only $2.50
|
Package has all 30 templates,
or buy singles for only $2.50
|
Package has all 37 templates,
or buy singles for only $2.50
|
Pack has 29 docs,
buy singles $2.50
|
Package has all 36 templates,
or buy singles for only $2.50
|
Package has all 32 templates,
or buy singles for only $2.50
|
Package has all 30 templates,
or buy singles for only $2.50
|
Package has all 32 templates,
or buy singles for only $3.00
|
Package has all 44 templates,
or buy singles for only $3.00
|
Package has all 30 templates,
or buy singles for only $3.00
|
Package has all 28 templates,
or buy singles for only $3.00
|
Special Request Items
Modified deliverables, modified plans, or other items may
be purchased here after prior arrangements with Support.
|
|